Dear All, Last time I left you I was about to embark on a mini rant about design and build contracting. The ‘righteous rage’ I was feeling has slightly subsided now a certain contractor has stopped asking me questions about ugly taps (I don’t think he sees these but if he does you know who you are!). Said contractor is actually lovely and very good at his job which makes it all the worse! Anyway, now the ‘rage’ has subsided and I spent yesterday fully absorbed in ‘Introduction to Building Procurement Systems (Second edition)’ for another writing project I thought I would pick up the topic in a calmer way with potentially less hyperbole!
Cheap taps, high interest rates and a bit too much detail about novation
Cheap taps, high interest rates and a bit too…
Cheap taps, high interest rates and a bit too much detail about novation
Dear All, Last time I left you I was about to embark on a mini rant about design and build contracting. The ‘righteous rage’ I was feeling has slightly subsided now a certain contractor has stopped asking me questions about ugly taps (I don’t think he sees these but if he does you know who you are!). Said contractor is actually lovely and very good at his job which makes it all the worse! Anyway, now the ‘rage’ has subsided and I spent yesterday fully absorbed in ‘Introduction to Building Procurement Systems (Second edition)’ for another writing project I thought I would pick up the topic in a calmer way with potentially less hyperbole!